干混砂漿儲料罐在工程建設中的使用
1.為實現(xiàn)砂漿即拌即用,節(jié)省施工時間,
To achieve instant mixing and use of mortar, saving construction time,
減少砂漿材料的浪
Reduce waves in mortar materials
費,降低環(huán)境污染,
Cost, reduce environmental pollution,
提高安全文明施工水平,
Improve the level of safe and civilized construction,
推廣使用干混砂漿儲料罐。
Promote the use of dry mixed mortar storage tanks.
2. 干混砂漿現(xiàn)場攪拌應符合地方政府的相關規(guī)定要求。
2. The on-site mixing of dry mixed mortar should comply with the relevant regulations of the local government.
3、干混砂漿儲料罐加工區(qū)布置應符合下列要求:
3. The layout of the dry mixed mortar storage tank processing area should meet the following requirements:
(1)宜設置在交通運輸便捷區(qū)域;
(1) It should be located in areas with convenient transportation;
(2)應設置三級配電箱、照明設施;
(2) Three level distribution boxes and lighting facilities should be installed;
(3)應在干混砂漿儲料罐旁設置水箱,
(3) A water tank should be installed next to the dry mixed mortar storage tank,
并在水箱中安裝浮球閥自動控制水位;
And install a float valve in the water tank to automatically control the water level;
(4)應在干混砂漿儲料罐外側地面,
(4) It should be placed on the outside ground of the dry mixed mortar storage tank,
用砂漿砌筑一道擋水坎;
Build a water barrier with mortar;
4、干混砂漿儲料罐在施工過程中應嚴格按工藝要求和各種物料
4. The dry mixed mortar storage tank should strictly follow the process requirements and various materials during the construction process
的配方比例,
The formula ratio,
進行準確配料,
Accurately mix ingredients,
保證水灰比,
Ensure the water cement ratio,
確保出料質(zhì)量。
Ensure the quality of the discharged material.
5.懸掛操作規(guī)程及責任牌。
5. Hang operating procedures and responsibility signs.